Commercial Air Conditioning Installation
The Server Room
When Henry Schein an International medical equipment distributoir refurbished its accounts department the server room was relocated to a more suitable location within the department.
It became obvious that the equipment within the room would require 24hr cooling.
Libra Facilities Ltd attended within 48hrs from point of instruction and installed a LG wall mounted system providing 3.5kw of cooling.
The indoor unit incorporated a gravity drain and infra red remote control unit.
A supervisor from LFL attended site on the day of completion and instructed the Accounts Manager on the operation of the equipment and confirmed to him that the unit would has a 3yr parts & labour warrenty.
After completion of the project LFL were awarded the service contract by Henry Schein to maintain over 50 various split and package systems within the property on a quarterly basis.