Commercial Air Conditioning Installation
The Hairdressers
Following a sales enquiry from Bola George, an L.F.L surveyor was booked to attend an empty retail outlet in Grove Park, London to provide a quotation for heat pump air conditioning.
Upon attending the premises it was clear that a 14kw LG Cassette system would be required to cope with the high heat loads caused by the hair dryers and solar gains. Fortunately the premises had 3 phase power and upon receiving an instruction from the client an installation team was allocated to the project. The LG equipment was delivered direct to site prior to the team attending, and once the ceiling grid had been completed work began in earnest.
As standard practice the L.F.L .Supervisor pressure tested the pipe work and LG Indoor Unit/pipework over a 24 hour period with Oxygen Free Nitrogen following which the equipment was wired and commissioned to the manufacturer's specification.
The system was demonstrated in both heating/cooling and the client commented on the professionalism of the L.F.L. installation team.
May we take this opportunity to wish Bola George at The Bolton Hair & Beauty Salon every success.